VOLTHAUL Energy develops, builds and operates front-of-meter battery storage projects connected to the grid through their own substation.


What we are looking for
We are looking for sites with a grid connection and land to host a storage project.
Grid connection
Secured connection capacity of at least 5 MW – or projects at ready-to-build (RTB) stage, or PV/wind farms that already hold a grid connection and have room for storage.
Land
2,000 m² (5 MW) to 10,000 m² (50 MW) at or next to the connection point, on a 25-year lease with an extension option. Greenfield sites considered if a connection can be secured.
For PV and wind farm owners
Adding storage to an existing farm creates value without extra effort for the owner.
- Additional income from storage co-located with the farm.
- Better use of the existing grid connection.
- No capital outlay required from the farm owner.
- We handle everything: permits, grid procedure, construction and operation.
How it works
Five steps from a site to an operating storage project.
- 1Site & grid connection
- 2Permitszoning, environmental, building
- 3Ready-to-build
- 4Construction
- 5Operation
Countries
We focus on Hungary, Slovakia and the Czech Republic.
Contact
Have a site, a grid connection or a farm with room for storage? Get in touch.